Commercial office aluminium frame Fixed single movable glass partition wall.
| Details | Specifications |
|---|---|
| Model | BG65 Hotel Movable Fabric Partition |
| Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
| Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
| Color | White, black, brown, grey, beige, customized. |
| Weight | Approx 22-35 kg/m² |
| Warranty | 3 years |
Moveable fabric partition can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
It is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the partition wall panel, there is sound insulation rubber, it can help to insulate the sound entering.
It is hanging on the aluminum track, assembled with muti direction wheels
Banquet hall acoustic movable wooden soundproof sliding folding partition wall
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Send us a message if you have any questions or request a quote. We will be back to you ASAP!