Demountable full height movable office tempered glass partition wall with aluminium frame
Get a Free Quote
Download Datasheet
Details | Specifications |
---|---|
Model | BG65 Hotel Movable Fabric Partition |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Moveable fabric partition can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
It is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the partition wall panel, there is sound insulation rubber, it can help to insulate the sound entering.
It is hanging on the aluminum track, assembled with muti direction wheels
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for moveable fabric partition panels.
Get a Discount Here
We have 4 types of partition system, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right one upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
Sea transportation.If it is urgent, it can be by air.
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The partition wall panel and track,fittings will be packed separately.
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Conference Room Division Removable Wood Partition Walls for Offices
Conference Room Division Removable Wood Partition Walls for Offices
Banquet hall acoustic movable wooden soundproof sliding folding partition wall
Conference Room Division Removable Wood Partition Walls for Offices
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.