Home » Movable Wall » BG65 movable wall
Aluminum acoustic hotel soundproof folding sliding movable partition wall
Folding door aluminum partition in Saudia Arabia soundproof folding moving partition wall
Highlights:
- Factory directly price
- Aluminum acoustic movable partition wall
- Folding and sliding, no floor track
- Soundproof and foldable panels
- Support customized size & surface
- Free AutoCAD design
- Quick shipping within 5 days
Specifications
Details | Specifications |
---|---|
Model | BG65 Series movable partition wall |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Aluminum track movable partition wall for hotel banquet hall
Folding movable partition wall can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
Conference room soundproof wall partition is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the panel, there is sound insulation rubber, it can help to insulate the sound entering. The soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.

Related Products

BG100 movable wall
Sliding folding wooden room movable partition wall for banquet hall

BG85 office glass partition wall
Commercial interior aluminum tempered movable office glass partition walls

BG65 movable wall
Aluminum acoustic hotel soundproof folding sliding movable partition wall