Home » Movable Wall » Movable restaurant partitions
Malaysia Soundproof Folding Movable Wall Hotel Restaurant Partitions
Movable restaurant partitions can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.
Highlights:
- Factory Direct Price
- Free Installation Guide for Movable Restaurant Partitions
- Free AutoCAD Design
- Quick Production Time Within 7 days
- 3 Years Warranty
- Reply In 8 Hours
Specifications
Details | Specifications |
---|---|
Model | BG65 Acoustic Movable Walls |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Malaysia Soundproof Folding Movable Wall Hotel Restaurant Partitions
Movable restaurant partitions can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
Movable restaurant partition is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the movable restaurant partition panel, there is sound insulation rubber, it can help to insulate the sound entering. The movable restaurant partition is hanging on the aluminum track, assembled with muti direction wheels.


Advantages
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for movable restaurant partitions.
FAQ
1. How to select the suitable movable restaurant partitions for your site?
We have 4 types of movable restaurant partitions, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right movable restaurant partitions upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for movable restaurant partitions difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the movable restaurant partitions?
Sea transportation.If it is urgent, it can be by air.
5. How do the movable restaurant partitions packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The movable restaurant partitions panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Related Products

Soundproofing sliding folding wall partition
Office Acoustic Movable Wooden Soundproof Sliding Room Folding Wall Partition

Room partition pakistan
Banquet Hall Folding Movable Wall Acoustic Room Partition Pakistan

Sliding partition wall philippines
Demountable Acoustic Movable Sliding Partition Wall Philippines