Effective spatial design starts with solving real-world challenges like acoustic management. Without precision engineering, even the most beautiful partition becomes a functional failure.
Deep Pain Point Analysis
A static gallery wall limits the venue to one event at a time. Every hour of ‘dead space’ is lost revenue.
[Engineering Decision]
We recommend the Series 100 for its ability to reach heights of up to 15 meters while maintaining high sound isolation.
[Risk Reminder]
Ensure the mechanical pressure seals are fully deployed at the floor level. Even a 5mm gap can reduce the STC rating by 10 points.
Engineer-led Technical FAQ
- Q: What is the maximum height for EBUNGE operable walls?
A: We have successfully engineered systems up to 15-18 meters for grand ballrooms and convention centers. - Q: Can these partitions be fire-rated?
A: Yes, we offer internal structures and finishes that meet various international fire safety standards, providing up to 60 minutes of protection. - Q: How do you verify the acoustic performance?
A: Our systems are tested in certified laboratories. We also provide onsite ASTC (Apparent Sound Transmission Class) testing upon request. - Q: What maintenance is required for the track system?
A: We recommend an annual professional inspection of the track alignment and lubrication of the carrier wheels. - Q: Are there options for glass integration?
A: Yes, we offer acoustic double-glazed windows and full-glass operable partitions for natural light optimization. - Q: Do these systems require a floor track?
A: No, all our professional-grade systems are top-hung, leaving your floor surfaces seamless and hazard-free.
Ready for a Technical Consultation?
To provide a precise engineering proposal, please share these 7 data points:
- Opening Dimensions (Width x Height)
- Target STC Rating (e.g., 45, 50, 55dB)
- Project Location (City and Country)
- Ceiling Structure Type (Concrete slab, steel beam, etc.)
- Preferred Surface Finish (Melamine, Fabric, Wood Veneer, etc.)
- Stacking Preference (Side stacking, parallel, or hidden pocket)
- Estimated Project Timeline
Connect with our engineering team for a free CAD layout design & quote →