Request a Technical Quotation
To provide an accurate factory-direct quote and track layout design, please provide the following project details:
1. Opening Width, 2. Opening Height, 3. Ceiling/Beam Structure, 4. Required STC Rating, 5. Surface Finish, 6. Stacking Direction, 7. Layout Drawing/Project Location.
At EBUNGE, we recommend Series 85 for most office projects (up to 6m) and Series 100 for high-load ballroom environments.
Frequently Asked Questions (Engineering Insights)
The operation of our partition system is engineered for near-silent performance, utilizing precision-machined **anodized track corrosion resistance** components and high-strength polymer wheels. To ensure long-term durability and smooth movement, we use Japanese-made ball bearings that minimize friction even under heavy loads. This architectural-grade tracking system allows for effortless reconfiguration of spaces without the disruptive metallic noise common in lower-quality alternatives.
Yes, achieving total acoustic separation is possible through our multi-layered panel construction featuring **100kg/m3 density mineral wool** and internal steel damping plates. Our patented mechanical systems apply a **25kg seal pressure** at both the floor and ceiling junctions to hermetically block sound bypass. For maximum performance, we also recommend installing a **ceiling plenum sound baffle** above the track to prevent flank transmission through the void above the suspended ceiling.
Absolutely, our systems are designed to integrate seamlessly with high-end interior aesthetics while maintaining rigorous engineering standards. The panels are custom-manufactured with hidden vertical aluminum profiles and can be finished in a variety of materials including acoustic fabric, wood veneer, or leather. Every component, from the visible surface to the internal mechanical seals, is built to provide both a luxurious visual impact and superior acoustic isolation.