中国に拠点を置く可動壁メーカー
Real Factory ~ No Middle Man

Acoustic movable wall, folding & sliding, only top hanging ceiling track, no floor track, customized support. 

Over 12 years experience in the field of movable wall

Committed to nice quality movable wall partition with amazing design echoing market needs to manage your space conveniently.

Outstanding Benefits

Factory directly prices & free sample with any quantities (no MOQ) for customized sizes and design. Use movable wall to divide your space make 50% more profitable.

Customized on Demand

You provide the movable wall size or layout and we generally will give you a solution with drawing and quotation in a day's time.

品質保証

BUNGE Company, which is specialized in the line of movable wall partition for more than 12 years. Besides the professional design and advanced technology, we also have serious QC team to check the quality.

All-in-one Solution

We provide every client movable wall with all-in-one solution from design, production, shipment, installation and after-sales service.

Contact us for movable wall free design & installation service

No MOQ, Customization Support

Your details will be kept strictly confidential with us.

Different Surfaces for Movable Walls System

We are always here to provide the different kinds of movable wall partition surfaces to meet all your different requirements.

Movable Wall with MDF

Movable Wall with Write Board

Movable Wall with Melamine

Fabric With Printed Picture

Movable Wall with Glass Partition

Movable Wall with Glass Partition

Ebunge Movable Wall

Movable Wall With Glass Window

Fabric Hard Cover Movable Wall

Leather Soft Cover Movable Wall

仕様

  • The movable wall partition is a hanging system, which only have the ceiling tracks, but there is no floor tracks. So it will not damage the carpet or floor at site.
  • There are 3 models for movable wall partitionssystem: 65, 85 and 100 mm thick panels, height can up to 15 meters.
  • Movable wall track system shall be extruded aluminium alloy material, the load capacity is at least 225 kg.
  • Based board is 9/12 mm MDF or Melamine with different acoustic treatment to the required level.
  • There is a top and bottom retractable mechanism inside the panel with 22.5/32 mm space. So there is almost no gap from top and bottom.

All-in-one Customization For Your Space Management

All of the movable wall partition can be customized as request. Let’s action now to get a unique design.

  • Free Auto CAD Design
  • Various Surfaces Available
  • More Than 100 Colors To Choose
  • Cusomized Packaging
Drawing Design
Different Surface
Partition Wheels
Panels Seal
Track Installation

Why Choose BUNGE Company As Your Supplying Partner

  • Around 3000 m² factory & showroom, which can ensure the delivery time no delay.
  • 2 professionals who reponsible for quality inspection, 3 times inspection before delivery.
  • 11 years experience in cooperating with the designers and contractors from all over the world.
  • Provide you a competitive quotation and profession plan within 1 hour(day time).
  • Quick production time around 15-25 days. Urgent order can be finished around 10 days.
  • Free installation guide and 18 technicians available to supervise the installation all over the world.

Good Feedback From Our Customers

Customers’ satisfaction is our biggest motivation to go ahead. Our factory is alwasy innovating some new designs to meet the different requirements. We sincerely thank you for customer’s trust and we will be always here to support your business.

jaJapanese

連絡する