Ebunge Partition - Your Trusted Movable Partition Manufacturer, Providing Reliable Space Management Solutions for Every Space.​

Effective spatial design starts with solving real-world challenges like acoustic management. Without precision engineering, even the most beautiful partition becomes a functional failure.

[Ebunge Transparency Disclosure]: As a leading global manufacturer with 15+ years of factory-direct experience, we provide these technical insights based on real-world engineering data. Our goal is to ensure your spatial solution meets both architectural aesthetics and rigorous acoustic standards.

Deep Pain Point Analysis

Static halls suffer from ‘dead time’ between events. Furthermore, poor sound insulation in multi-room setups leads to client dissatisfaction and refund requests.

[Engineering Decision]

For heights exceeding 5 meters, we recommend the Series 100. Integrating automated seals reduces setup time by 70%, allowing for back-to-back event bookings.

[Risk Reminder]

Always inspect the track trolley systems every 6 months. Debris in the track can lead to uneven panel weight distribution and structural strain.

Engineer-led Technical FAQ

  • Q: What is the maximum height for EBUNGE operable walls?
    A: We have successfully engineered systems up to 15-18 meters for grand ballrooms and convention centers.
  • Q: Can these partitions be fire-rated?
    A: Yes, we offer internal structures and finishes that meet various international fire safety standards, providing up to 60 minutes of protection.
  • Q: How do you verify the acoustic performance?
    A: Our systems are tested in certified laboratories. We also provide onsite ASTC (Apparent Sound Transmission Class) testing upon request.
  • Q: What maintenance is required for the track system?
    A: We recommend an annual professional inspection of the track alignment and lubrication of the carrier wheels.
  • Q: Are there options for glass integration?
    A: Yes, we offer acoustic double-glazed windows and full-glass operable partitions for natural light optimization.
  • Q: Do these systems require a floor track?
    A: No, all our professional-grade systems are top-hung, leaving your floor surfaces seamless and hazard-free.

Ready for a Technical Consultation?

To provide a precise engineering proposal, please share these 7 data points:

  1. Opening Dimensions (Width x Height)
  2. Target STC Rating (e.g., 45, 50, 55dB)
  3. Project Location (City and Country)
  4. Ceiling Structure Type (Concrete slab, steel beam, etc.)
  5. Preferred Surface Finish (Melamine, Fabric, Wood Veneer, etc.)
  6. Stacking Preference (Side stacking, parallel, or hidden pocket)
  7. Estimated Project Timeline

Connect with our engineering team for a free CAD layout design & quote →

Request a Free Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!