Ebunge Partition - Your Trusted Movable Partition Manufacturer, Providing Reliable Space Management Solutions for Every Space.​

Effective spatial design starts with solving real-world challenges like acoustic management. Without precision engineering, even the most beautiful partition becomes a functional failure.

[Ebunge Transparency Disclosure]: As a leading global manufacturer with 15+ years of factory-direct experience, we provide these technical insights based on real-world engineering data. Our goal is to ensure your spatial solution meets both architectural aesthetics and rigorous acoustic standards.

Deep Pain Point Analysis

In an auditorium, the biggest pain point is ‘vocal bleed’ where a professor’s voice in one room is heard in the other. This destroys student concentration and reduces the value of the venue.

[Engineering Decision]

We recommend the Series 100 with internal steel plates. The steel adds mass without significantly increasing thickness, achieving STC 56.

[Risk Reminder]

Ensure the ceiling track is perfectly level. Even a 1mm incline over 10 meters can cause panels to drift.

Engineer-led Technical FAQ

  • Q: What is the maximum height for EBUNGE operable walls?
    A: We have successfully engineered systems up to 15-18 meters for grand ballrooms and convention centers.
  • Q: Can these partitions be fire-rated?
    A: Yes, we offer internal structures and finishes that meet various international fire safety standards, providing up to 60 minutes of protection.
  • Q: How do you verify the acoustic performance?
    A: Our systems are tested in certified laboratories. We also provide onsite ASTC (Apparent Sound Transmission Class) testing upon request.
  • Q: What maintenance is required for the track system?
    A: We recommend an annual professional inspection of the track alignment and lubrication of the carrier wheels.
  • Q: Are there options for glass integration?
    A: Yes, we offer acoustic double-glazed windows and full-glass operable partitions for natural light optimization.
  • Q: Do these systems require a floor track?
    A: No, all our professional-grade systems are top-hung, leaving your floor surfaces seamless and hazard-free.

Ready for a Technical Consultation?

To provide a precise engineering proposal, please share these 7 data points:

  1. Opening Dimensions (Width x Height)
  2. Target STC Rating (e.g., 45, 50, 55dB)
  3. Project Location (City and Country)
  4. Ceiling Structure Type (Concrete slab, steel beam, etc.)
  5. Preferred Surface Finish (Melamine, Fabric, Wood Veneer, etc.)
  6. Stacking Preference (Side stacking, parallel, or hidden pocket)
  7. Estimated Project Timeline

Connect with our engineering team for a free CAD layout design & quote →

Request a Free Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!