Stacking Pocket Corridor Width Change Circulation Audit
Quick project answer
Review focus: corridor width.
A stacking pocket corridor width change circulation audit is a drawing-stage review of how people, doors and parked panels share the same corridor junction. It matters most where a movable wall opens across a room and its panels park at a point where the corridor narrows or widens. This guide sets out what to check, what drawings should show, and which statements need project-specific confirmation before layout sign-off.
Why the pocket location and the corridor change interact
EBUNGE movable wall panels are individually movable and suspended from a top track. They cross the opening without a floor track and park at a planned stacking position. That clear-floor behaviour is useful in busy corridors, but it also means the parked panels occupy a defined footprint at the end of their route.
When that footprint lands at a corridor width change, two conditions meet in one small area: the narrowing or widening itself, and the space reserved for parked panels. A circulation audit treats them as one problem rather than two separate drawings.
What the audit should record before layout sign-off
Keep the audit factual. It records what the drawings show, what remains unresolved, and who must confirm each item. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence.
Core drawing inputs
- Plan and reflected ceiling plan showing the opening, the top track line and the planned stacking position.
- Corridor widths on both sides of the change, with the transition drawn to scale.
- Door swings, escape routes, service risers and any fixed furniture near the pocket.
- Straight, turning and stacking routes marked as a single connected overhead path.
- Finish selections from the confirmed options: laminate, melamine, fabric, leather, glass or other approved surfaces.
Open questions to log
List anything the drawings cannot answer, such as support conditions above the track, the final parking arrangement, or pass-door requirements. These are project-specific items for the design team and supplier to resolve together, not assumptions to be filled in later on site.
A five-step circulation audit process
- Trace the full route. Mark every panel movement from closed position to parked position, including turns. Confirm the overhead route is continuous and supported along its whole length.
- Draw the parked footprint. Show the stacking position at the corridor change at full scale, including clearance needed to move the last panel into place.
- Test the narrowed corridor. Check the remaining clear width against the project’s own circulation and accessibility requirements, using the drawings rather than assumed figures.
- Review sightlines and doors. Confirm that doors, glazed screens and the corridor transition do not conflict with the parked panels or the movement path.
- Record evidence status. For each item, note whether it is confirmed on drawings, pending supplier input, or awaiting a specialist review.
Evidence note: a plan view shows position and route, not acoustic performance, structural adequacy or approval. Those require separate project-specific confirmation.
Coordination points across the project team
Each party checks a different layer: the architect the route and structure above, the designer the finishes and sightlines, the contractor the build sequence, and the owner the operational use of the space.
Where pass-door requirements exist, raise them during this review rather than after the pocket is fixed. A pass door changes how people move through a closed partition and can affect how the corridor junction is used day to day.
Evidence limits: what a drawing cannot prove
If acoustic separation matters at this junction, ask for project-specific documentation and treat it as a separate review.
Similarly, a finish sample does not confirm cleaning compatibility, and a parking sketch does not confirm support capacity. Keep each claim tied to the document that actually supports it.
Common audit failures at corridor width changes
- The movement route is shown as a straight line that ignores a required turn.
- Parked panels are assumed to sit outside the corridor without a scaled footprint.
- Pass-door needs are raised after the pocket location is fixed.
- Acoustic expectations are written into the brief without matching project documentation.
Documentation to carry into the specification
A stacking pocket corridor width change circulation audit specification should reference the reviewed drawings, the confirmed finish selection, the parking arrangement and any pass-door requirements. It should also state which items remain open and who owns them.
Review the maintained product context on the movable walls page and the planning material in the resources section before finalising the brief. Confirm support, acoustic and dimensional requirements for your specific project with the relevant specialists.
Frequently asked questions
Does a movable wall need a floor track at the corridor change?
No. EBUNGE panels are top-hung and cross the opening without a continuous floor track along the partition line. The parked panels still occupy a footprint, which is why the audit checks the stacking position at full scale.
Can panels turn a corner to reach the pocket?
The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings.
How wide should the corridor remain beside the pocket?
That depends on your project’s circulation and accessibility requirements and on the parked footprint. Confirm both against scaled drawings rather than a general rule.
Can a pass door be included?
Pass-door requirements can be discussed as part of the project review. Raise them early, because they affect how the closed partition is used near the corridor junction.
Does the audit confirm acoustic performance?
No. The audit covers circulation and layout.
Which finishes can be specified?
Confirmed options include laminate, melamine, fabric, leather, glass and other approved surfaces. Confirm suitability for your project separately.
Conclusion and next step
A stacking pocket corridor width change circulation audit is a small, disciplined drawing review that prevents a recurring problem: a parking position that looks fine on one sheet and blocks a corridor on another. Trace the route, draw the footprint, log the evidence and confirm the open items before sign-off.
To discuss your layout, pass-door needs and project documentation, contact the EBUNGE team with your drawings and requirements.


