Stacking Pocket Corridor Kink Clear Width Check
Quick answer: clear width
A stacking pocket corridor kink clear width check belongs on the drawing review agenda as soon as a movable wall is planned to park near a change in corridor direction. The check is not a single measurement. It combines the parked panel envelope, the remaining circulation zone, the turning path at the kink and the overhead route that connects the opening to the stacking position. EBUNGE movable wall panels are individually movable and suspended from a top track; they cross the opening without a floor track and park at a planned stacking position. Those confirmed facts define what the review can rely on.
The exact overhead route and support arrangement must be confirmed by the responsible project team from coordinated drawings.
Why the corridor kink changes the review
A straight run gives the reviewer one clear width to test. A kink introduces a second geometry: the path bends while the pocket occupies part of the adjacent zone. The risk is not that the panels are unusual; it is that the parked envelope and the turning envelope compete for the same floor area.
Treat the kink as a joint problem between the partition layout and the circulation plan. The pocket location, the direction of travel and the position of doors or openings on the approach all influence whether the remaining route works. None of these can be settled from a product photograph or a finish sample.
What the confirmed product facts allow
Because the panels are top-hung and cross the opening without a floor track, the floor along the partition line stays clear of running hardware. That helps the reviewer separate two questions: what happens while the wall is open, and what happens while panels are parked. The parked condition still needs its own clear width check.
Build the check from the parked condition
Start with the wall in its stacked state, not its open state. The stacking position is planned, so the drawing should show where panels come to rest and how much of the adjacent corridor zone that position occupies. Reviewers should ask for the panel envelope as a drawn footprint, then test the remaining route around the kink.
- Mark the planned stacking position on the layout and identify the corridor edge it affects.
- Draw the parked panel envelope at the pocket, using dimensions confirmed for the project.
- Trace the turning path through the kink and note where it narrows.
- Compare the remaining width with the accessibility criteria that apply to the building.
- Record every assumption that still needs project-specific confirmation.
Separate the three envelopes
Reviewers often merge three different envelopes into one discussion. Keep them apart: the parked panel envelope, the moving-panel envelope during operation, and the pedestrian turning envelope at the kink. Each has its own drawing and its own confirmation path. A clear width check that ignores one of them will produce a false sense of resolution.
Route review: straight, turning and stacking
EBUNGE reviews straight, turning and stacking routes from the layout. That means the drawing set should show the full path from the opening to the parking position, including any change of direction. A kink near the pocket is exactly the condition where a route drawing earns its place.
The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings. Support requires project-specific review. The reviewer should therefore confirm that the drawn route and the drawn support condition match, and should not infer either from a finish schedule or a room photograph.
Questions for the route drawing
- Does the route remain connected through the kink to the stacking position?
- Is the turning geometry shown, or only described in notes?
- Does the parked envelope overlap any door swing, fire equipment or fixed furniture?
- Has the support condition been reviewed for the actual layout?
Evidence limits on width and acoustics
Clear width is a project dimension. It depends on the confirmed panel envelope, the wall build-up, the corridor geometry and the accessibility standard adopted for the building. This article cannot supply a number, and no finish or drawing should be read as a measured result.
Acoustic concepts follow the same rule. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence. Seals and acoustic detailing can be discussed generically, but the project team must confirm the acoustic requirement and the supporting documentation separately.
Evidence note: the only product facts used here are that panels are individually movable, top-hung, cross the opening without a floor track and park at a planned stacking position; that straight, turning and stacking routes are reviewed from the layout; and that finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. All dimensions, support, acoustic and accessibility outcomes require project-specific confirmation.
Coordinate the check across disciplines
A single-discipline review can miss the conflict. Bring the layout drawing, the route drawing and the accessibility plan into the same session, and record decisions against drawing revisions.
Where a pass door is required, raise it during the same review rather than after the pocket is fixed. Pass-door requirements and project documentation can be discussed with EBUNGE, but the final configuration depends on the confirmed layout and the criteria the project adopts.
Finish choices near the kink
Confirmed finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. Visible references can support layout discussion but do not verify hidden construction or performance. Keep finish decisions separate from the clear width check so that neither is used to justify the other.
Decision checklist for the drawing review
| Check | What to confirm | Evidence status |
|---|---|---|
| Stacking position | Planned location shown on layout | Project drawing required |
| Parked envelope | Footprint of panels at rest | Project dimension required |
| Turning path | Route through the kink | Project drawing required |
| Overhead route | Continuous and connected to pocket | Project-specific review |
| Support | Condition above the route | Project-specific review |
| Accessibility | Adopted clear width criteria | Project standard required |
| Acoustics | Requirement and documentation | Project-specific confirmation |
Use the table as a meeting record, not as a compliance certificate. Each row should carry a drawing reference and an owner before the review closes.
FAQ
Can the clear width be confirmed from a product page?
No. A product page can describe confirmed product facts, but clear width depends on the project layout, the parked envelope and the accessibility criteria adopted for the building. Confirm those items from project drawings.
Does a floor track affect the kink check?
EBUNGE panels cross the opening without a floor track, so there is no continuous floor running track along the partition line. The parked condition still needs its own width check at the kink.
How should the turning route be documented?
Show the route from the opening to the stacking position on the layout, including the change of direction at the kink. Straight, turning and stacking routes are reviewed from the layout, and the overhead route must be continuous and connected.
Can acoustic performance be promised for the kinked condition?
No promise should be made here.
When should a pass door be discussed?
Raise pass-door requirements during the same drawing review as the pocket and route. EBUNGE can discuss pass-door requirements and project documentation, but the final arrangement depends on the confirmed layout.
Which finish should be specified near the kink?
Confirmed options include laminate, melamine, fabric, leather, glass and other approved surfaces. Choose the finish for visual and maintenance reasons after the clear width and route checks are resolved, and confirm suitability for the project.
Conclusion and next step
Keep the confirmed EBUNGE facts separate from the project decisions, and do not let a finish sample or a photograph stand in for a dimension.