Stacking Pocket Corridor Bend Clear Width Check
Quick answer: clear width
A stacking pocket corridor bend clear width check is a drawing-based review, not a single measurement. It asks whether people, equipment and the partition panels themselves can pass a corridor that turns near the place where panels park. Because EBUNGE movable wall panels are individually movable and suspended from a top track, the review must cover two different paths: the circulation route through the corridor, and the overhead route the panels follow to their planned stacking position. This article sets out a coordination framework for contractors, architects, interior designers, owners and renovation teams. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence.
Why a corridor bend changes the review
A straight run is easy to read on a plan. A bend introduces a second geometry. The corridor narrows visually at the inside corner, sightlines shorten, and the relationship between the walking route and the pocket opening becomes harder to judge from a single view.
The pocket adds a third element. Panels cross the opening without a floor track and park at a planned stacking position. That parking area occupies floor and ceiling zone, and its position relative to the bend determines how the last panels behave as they leave the opening.
Two routes, one drawing
Treat the circulation route and the panel route as separate lines on the same layout. The first is reviewed for clear width and turning. The second is reviewed for continuity and support. Where the two overlap near the bend, the review becomes a coordination exercise rather than a check of one dimension.
Route continuity from opening to pocket
Straight, turning and stacking routes should be reviewed from the layout. EBUNGE panels are top-hung and move without a continuous floor running track or floor hardware along the partition line, so the visible floor stays clear. That does not mean the overhead route can be discontinuous.
Every proposed movement path requires a continuous connected overhead route and project-specific support review. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings.
What to mark on the layout
- The closed partition line and the opening it serves.
- The planned stacking position and its footprint.
- The corridor centreline and the inside corner of the bend.
- Any fixed elements near the bend that reduce usable space.
A decision checklist for the bend zone
Use this checklist in design coordination meetings. Each item should be answered from drawings or confirmed by the responsible party, not assumed from a photograph or a similar project.
- Is the corridor clear width at the bend shown on the same drawing as the pocket?
- Does the pocket opening face the corridor in a way that keeps the turning route readable?
- Is the parking footprint fully inside the planned stacking position?
- Is the overhead route continuous through the turn, with support reviewed for the project?
- Are pass-door requirements identified where a door within the partition is needed?
- Are finish selections recorded against the approved options for the project?
- Are acoustic expectations described as project requirements rather than inferred from the layout?
Parking space and the inside corner
Parking style is customized to the customer layout and project requirements and may support compact stacking when the coordinated design permits it. The word coordinated matters.
Review the pocket as a room-like zone with a defined boundary. Then check the corridor edge at the inside corner. If the pocket opening and the corner compete for the same floor area, the layout may need adjustment before specification proceeds.
Comparison of review questions
| Review area | Question to answer | Evidence needed |
|---|---|---|
| Corridor clear width | Is the maintained width at the bend adequate for the intended use? | Dimensioned plan and project circulation requirements |
| Turning route | Can panels travel from opening to pocket through the turn? | Layout showing route and continuous overhead path |
| Stacking position | Does the parking footprint fit the planned pocket? | Coordinated layout and confirmed parking arrangement |
| Support | Is the overhead structure reviewed for the project? | Project-specific structural confirmation |
| Acoustics | Are the required acoustic conditions defined? | Project acoustic requirements and matching evidence |
Acoustic and finish notes without overreach
Seals and joints affect how an assembly performs, but the specific configuration must be confirmed for the project.
Confirmed finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. Visible references can support layout discussion but do not verify hidden construction or performance.
Evidence note: this article describes a review method. It does not state measured clear widths, acoustic results, structural capacity or application reference outcomes. Those must come from project-specific documentation.
Documentation to request before sign-off
Project documentation can be discussed with the supplier. Ask for the layout review to be recorded so that the bend, the pocket and the route are reviewed together rather than in separate packages.
Useful items include the coordinated floor plan, the reflected ceiling plan showing the overhead route, the parking arrangement, finish selections and any pass-door requirements. Where acoustic conditions matter, define the requirement and request matching evidence rather than inferring performance from the drawing.
Coordination with other trades
A change to any of these near the bend can affect the pocket zone, so the review should be repeated when the layout changes.
Frequently asked questions
What is a stacking pocket corridor bend clear width check?
It is a drawing review that examines the corridor clear width where it bends near a movable partition stacking pocket, together with the route panels follow to their parking position.
Do the panels need a floor track to reach the pocket?
No. EBUNGE movable wall panels are top-hung and move without a continuous floor running track or floor hardware along the partition line. The overhead route must still be continuous and supported, and that must be reviewed for the project.
Can the pocket be placed close to the bend?
Placement depends on the coordinated layout. Parking style is customized to the customer layout and project requirements, so the pocket position should be reviewed with the corridor geometry rather than decided in isolation.
Does a bend affect acoustic performance?
Acoustic requirements should be defined for the project and matched with appropriate evidence.
Which finishes can be considered?
Confirmed options include laminate, melamine, fabric, leather, glass and other approved surfaces. Final selection should be recorded against the project specification.
Can a pass door be included?
Pass-door requirements can be discussed as part of the project review. The position of a pass door near a bend should be checked against the circulation route.
Conclusion and next step
Keep the corridor route and the panel route on the same layout, confirm the parking position, and record the support and acoustic requirements that apply to the project. Avoid treating a plan view as proof of performance.
To take the review further, explore the movable wall product range, read the planning material in our resources section, and contact the team to discuss your layout, pass-door requirements and project documentation.


