Contractor’s Pre-Installation Survey Checklist for Partition Tracks
Quick answer: installation survey
Review focus: installation survey.
A partition track pre-installation survey checklist helps a project team confirm what the drawings show, what the site actually reveals, and what still needs written clarification before any track or panel work starts. For overseas contractors, architects and renovation teams, the survey is less about ticking boxes and more about closing gaps between design intent and site conditions. This article sets out a practical framework built on confirmed EBUNGE product facts and clear evidence limits, so every item you record can be traced to a drawing, a site observation or a project-specific confirmation.
Movable wall panels are individually movable and suspended from a top track. They cross the opening without a floor track and park at a planned stacking position. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings. Use the movable walls product overview as background, then confirm everything against your own project documents.
Why the Track Survey Comes Before the Panel Schedule
Project review term: installation survey.
Panel quantities and finish selections are visible on paper, but the track depends on conditions that paper rarely captures completely. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence.
Treat the survey as a coordination document rather than a purchasing step. It gives the contractor, designer and supplier a shared record of what was observed, what was assumed and what remains open. Where an item cannot be verified on site, record it as an open question instead of inferring a conclusion from a photograph or a previous project.
Route Review: Straight, Turning and Stacking Paths
Coordination scope: installation survey.
EBUNGE reviews straight, turning and stacking routes from the layout. Your survey should therefore capture the full movement path, not only the main opening. Walk the route on site with the drawing in hand and note where the path passes near columns, service risers, glazing or changes in ceiling height.
What to Record Along the Route
- The start and end points of each straight run, and where turns occur.
- The planned stacking position and how panels are expected to reach it.
- Any obstruction, level change or interface that the drawing does not show.
- Openings or gaps along the proposed path that would interrupt a continuous overhead route.
Every proposed movement path requires a continuous connected overhead route and project-specific support review. If the layout shows a break, raise it for design clarification before the survey is signed off.
Overhead Conditions and Support Coordination
Checklist focus: installation survey.
Because panels hang from a top track, the structure above the opening is central to the survey.
- Photograph and describe the ceiling or soffit condition along the full route.
- Record who is responsible for confirming support, and by when.
- Keep the confirmation in writing before installation planning proceeds.
Support capacity, fixing methods and load assumptions are engineering matters that require project-specific evidence. A visible ceiling finish tells you nothing about what it can carry.
Parking Position and Clear Floor Operation
Parking style is customised to the customer layout and project requirements, and may support compact stacking when the coordinated design permits it. The survey should confirm that the intended parking zone is clear, accessible and consistent with the layout drawing.
Also confirm the clear-floor expectation. EBUNGE panels move without a continuous floor running track or floor hardware along the partition line, so the survey should check that the floor finish and adjacent thresholds do not conflict with the planned route. Note any floor-level features that the design team should review.
Finish, Pass-Door and Documentation Checks
Confirmed finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. Record the specified finish for each panel face and note where the design intent is unclear.
Pass-door requirements should be discussed with the supplier and captured in the survey notes, including location and intended use. Project documentation can also be discussed, so list the drawings, schedules and approvals your team expects to exchange. Use the resources section for general planning context, and keep project-specific questions in the written record.
Acoustic Concepts and Evidence Boundaries
A rating that applies to a tested assembly does not automatically transfer to a different configuration, installation or building condition.
Evidence note: this checklist does not establish acoustic, fire, structural or durability performance. Any such requirement must be confirmed against project-specific documentation supplied for your configuration.
Seals and acoustic concepts can be explained generically during planning, but the survey should record the requirement and the responsible reviewer rather than infer an outcome from a drawing or a sample.
Decision Checklist for Survey Sign-Off
| Survey item | Evidence to hold | Status |
|---|---|---|
| Movement route | Layout drawing with straight, turning and stacking paths marked | Confirmed / open |
| Overhead continuity | Drawing review plus site photographs of the full route | Confirmed / open |
| Support responsibility | Written confirmation from the responsible structural party | Confirmed / open |
| Parking zone | Layout extract and site observation of the stacking area | Confirmed / open |
| Finishes | Approved finish schedule per panel face | Confirmed / open |
| Pass doors | Written requirement discussed with the supplier | Confirmed / open |
Sign off only when each row has a named evidence source. Rows marked open should carry an owner and a date for resolution.
Frequently Asked Questions
Who should attend the partition track pre-installation survey?
The supplier can review layout information, but site observations should be recorded by those present.
Can the survey confirm acoustic performance on site?
No. The survey records requirements and observations.
What if the layout shows a gap in the movement path?
Raise it for design clarification. Every proposed path requires a continuous connected overhead route, and the gap must be resolved in the drawings before installation planning continues.
Do panels need a floor track along the opening?
No. EBUNGE panels are top-hung and cross the opening without a continuous floor running track or floor hardware along the partition line. Floor conditions along the route should still be recorded.
How are finishes and pass doors handled in the survey?
Record the specified finish per panel face from the approved schedule, and note pass-door requirements for discussion with the supplier. Both should appear in the written survey record.
When is the survey complete?
When every checklist row has an evidence source and open items have an owner and date. Completion of the survey does not replace project-specific engineering, acoustic or dimensional confirmation.
Conclusion and Next Step
A disciplined survey protects the project from assumptions that surface too late. Confirm routes, overhead continuity, parking, finishes and documentation in writing, and keep performance questions with the parties who can evidence them. If your team is preparing a movable wall package, contact EBUNGE to discuss layout review, pass-door requirements and project documentation.


