Contractor's Install Sequence When Track Fixing Splits Around a Live
Quick answer: live stair
Review focus: live stair.
A track fixing live stair install sequence matters when a movable partition must cross an opening while a stair stays in use and the overhead route cannot run as one uninterrupted straight line. The sequence below is a coordination framework for contractors, architects and site teams. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence.
Why a Split Track Route Changes the Install Conversation
Project review term: live stair.
EBUNGE movable wall panels are individually movable, suspended from a top track, and cross the opening without a floor track. Panels park at a planned stacking position. That clear-floor principle is simple to describe, but the overhead route still has to be continuous and supported along every segment the panels are intended to travel.
When a live stair interrupts that route, the project is no longer a single-run installation. Straight, turning and stacking routes are reviewed from the layout, so the stair becomes a layout constraint before it becomes a fixing question. Treat the split as a design condition to be resolved on drawings, not as a site improvisation.
Step 1: Freeze the Movement Route Before Any Fixing Discussion
Start with the route, not the fixing. Mark the opening, the intended crossing line, every turn, and the planned stacking position on the current architectural layout. Then mark the stair, its protected zone and any adjacent circulation that must remain open during works.
Ask whether the proposed route is continuous and connected across the full travel path. A gap in the overhead route is not something panels can cross. If the layout shows a break at the stair, the design team must resolve how the route continues before installation planning proceeds.
Information to collect at this stage
- Current layout drawing showing the opening, stair and stacking area.
- Confirmed panel finish selection from the approved options: laminate, melamine, fabric, leather, glass or other approved surfaces.
- Any pass-door requirement, since this affects panel configuration and route planning.
- Site access constraints around the live stair during the works.
Step 2: Separate Drawing Review from Site Verification
Drawing review answers what the project intends. Site verification answers what the building actually presents.
During verification, note visible conditions along the proposed route and around the stair. Record what can be seen and measured on site, and flag anything that differs from the drawing.
Evidence note: this article describes a coordination sequence only. Support arrangements, fixing details, acoustic performance and dimensional limits must be confirmed for the specific project against reviewed drawings and matching evidence.
Step 3: Coordinate the Split with the Stair in Use
A live stair means the work area and the circulation area overlap in time. Plan the sequence so that route preparation, fixing activity and panel handling are each considered against stair use, not treated as independent tasks.
Agree who controls the stair zone, when access is restricted, and how temporary protection is maintained. These are project decisions; they depend on the building, the programme and the responsible parties. The important editorial point is that the sequence must be written down and shared before work starts.
Coordination checklist
- Confirm the approved layout revision is the one used on site.
- Confirm the route is continuous across the stair condition on that revision.
- Confirm the stacking position is reachable along the planned route.
- Confirm stair protection and access arrangements with the responsible site party.
- Confirm finish and pass-door requirements are reflected in the panel schedule.
- Confirm what must be verified on site before fixing begins.
Step 4: Sequence the Fixing Work Around the Split
Where the route divides around the stair, work from the reviewed layout rather than from habit. Establish the route segments in the order the drawings define, and keep each segment traceable to its drawing reference. Avoid treating one segment as a template for another unless the drawings show them as equivalent.
Keep the stacking end in view throughout. Parking style is customized to the customer layout and project requirements, and compact stacking may be possible when the coordinated design permits it. The stacking position should be confirmed as part of the route review, not decided after fixing.
| Stage | Primary question | Record to keep |
|---|---|---|
| Route freeze | Is the overhead route continuous across the stair condition? | Marked-up layout revision |
| Site verification | Does the building match the reviewed drawing? | Site notes and flagged differences |
| Coordination | Are stair use and work access agreed? | Shared sequence and responsibilities |
| Fixing | Does each segment follow its drawing reference? | Segment-by-segment traceability |
| Handover | Are operation and parking demonstrated as planned? | Handover record |
Step 5: Check Operation and Handover
Once fixing is complete, check that panels move individually along the intended route, cross the opening without a floor track, and park at the planned stacking position. Confirm any pass-door arrangement works as agreed. Record observations against the reviewed layout so that open items are visible to the project team.
Where acoustic requirements apply, confirm them for the specific project with the responsible acoustic and design specialists.
For product context, see the movable wall systems page. For planning material, use the resources section. To raise project-specific questions, contact the team with your layout and requirements.
Frequently Asked Questions
Can panels cross a gap in the overhead track at a stair?
No. Every proposed movement path requires a continuous connected overhead route, and the support arrangement must be reviewed for the project. A split in the fixing layout is a design condition to resolve on drawings.
Does a live stair require a floor track for the partition?
No floor track is used along the partition line. EBUNGE panels are top-hung and cross the opening without a floor running track. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings.
Which finishes can be specified?
Confirmed finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. Selection should be recorded in the project documentation and confirmed against the approved schedule.
How is the stacking position decided?
Parking style is customized to the customer layout and project requirements, and compact stacking may be possible when the coordinated design permits it. The position should be agreed during route review.
Can a pass door be included?
Pass-door requirements can be discussed as part of project planning. They affect panel configuration and should be raised early so the layout and documentation reflect them.
What should be confirmed before fixing starts?
Confirm the approved layout revision, route continuity, site conditions against drawings, stair access arrangements, finish schedule and pass-door requirements. Support and acoustic requirements need their own project-specific confirmation.
Conclusion
Keep every decision tied to a reviewed drawing and a recorded site observation, and leave performance, support and dimensional questions to project-specific confirmation.
Send your layout, stair condition and finish requirements through the contact page so the project team can discuss the next planning step with you.


