Stacking Pocket Corridor Recess Clear Width Check
Quick project answer
A stacking pocket corridor recess clear width check belongs in the earliest drawing reviews, not in the final site walk. Where a movable partition parks beside a circulation route, the pocket, the recess and the corridor share one narrow zone. Each discipline tends to draw that zone separately, and the conflicts only appear when the drawings are overlaid.
This guide sets out a review framework for contractors, architects, interior designers, owners and renovation teams. It stays within confirmed EBUNGE product facts and treats every dimension, support condition and acoustic target as project-specific information to be confirmed from the coordinated design.
Why the Pocket and the Recess Compete for the Same Space
EBUNGE movable wall panels are individually movable and suspended from a top track. They cross the opening without a floor track and park at a planned stacking position. That clear-floor behaviour is useful for circulation, but it also means the parking zone is defined by the overhead route and the space reserved for stacked panels, not by floor hardware.
A corridor recess is usually drawn to relieve pinch points, house services or provide door clearance. When the stacking position sits next to or inside that recess, the two reservations overlap. The clear width check is the exercise of proving that the remaining route still works for the people, equipment and furniture expected to use it.
What the check is not
It is not a single number copied from a code table, and it is not a substitute for the project’s accessibility consultant or authority review. It is a coordination test: does the drawn geometry, with panels parked, still leave the route the project has committed to?
Start With the Movement Route, Not the Pocket
Straight, turning and stacking routes are reviewed from the layout. Before measuring the recess, trace how panels travel from the closed position to the parking position. A route that looks short on plan may cross a corridor, pass a door swing or turn tightly near a column.
Every proposed movement path requires a continuous connected overhead route and project-specific support review. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings. If the layout shows a break, the route needs redesign or engineering confirmation, not a drawing note.
- Mark the closed partition line and the full parking envelope on the same plan.
- Draw the travel path for each panel group, including turns.
- Identify any door swing, service riser, column or ceiling change along the path.
- Confirm the overhead route is continuous and supported per project review.
- Record who owns each unresolved interface before the next design freeze.
Define the Clear Width Line Before Measuring
Teams often measure different things and then compare results. Agree first which line represents the maintained route: the narrowest point between fixed obstructions, or the route edge defined by the project’s accessibility strategy. Then measure with panels parked, not only with panels open.
The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence. A recess that gains width in plan may lose it to a projecting sprinkler branch, a wall lining build-up or a floor finish transition. These are visible drawing items, not hidden performance assumptions.
A compact comparison of review states
| State | What to check | Evidence needed |
|---|---|---|
| Panels open | Opening clear width and door swing | Coordinated plan and section |
| Panels in transit | Travel path, turns and temporary obstruction | Route drawing reviewed by the project team |
| Panels parked | Stacking envelope versus corridor recess | Parking layout and confirmed dimensions |
| Services installed | Projecting items inside the recess | Combined services and ceiling drawings |
The table is a review structure, not a performance statement. Each row must be filled with project-specific information and checked by the responsible designers.
Coordinate the Stacking Envelope With the Recess Geometry
Parking style is customized to the customer layout and project requirements and may support compact stacking when the coordinated design permits it. That flexibility helps, but it does not remove the need to reserve space. The stacking envelope should be drawn as a real volume, including the parked panel group and any clearance the project decides to maintain around it.
Where the recess is shallow, ask whether the parking position can move along the track, turn into a dedicated bay or use a different stacking arrangement. These are layout questions for the project team, answered from drawings rather than assumed from a product photograph.
Interfaces that commonly erode width
- Wall and column linings that reduce the drawn recess.
- Ceiling bulkheads and service zones above the parking position.
- Door frames, ironmongery and adjacent door swings.
- Floor finish transitions and thresholds near the route.
- Signage, fire equipment and furniture shown on loose-furniture plans.
Finishes, Seals and Acoustic Expectations at the Recess
Confirmed finish options include laminate, melamine, fabric, leather, glass and other approved surfaces. Those topics need their own project evidence.
Confirm acoustic requirements and supporting documentation for the specific project.
Evidence note: visible geometry, finish samples and drawings do not demonstrate acoustic, fire, load or durability performance. Ask for the matching project documentation before relying on any such statement.
Build the Drawing Review Into the Programme
Run the clear width check at each design stage, then repeat it when services, ceilings or finishes change. A pocket that worked at concept stage can fail once the corridor lining thickens or a door is relocated.
- Issue a combined plan showing the partition line, travel route and parking envelope.
- Mark the agreed clear width line and the reference points used to measure it.
- Record open questions on support, dimensions and acoustic requirements.
- Confirm pass-door requirements and project documentation with the supplier.
- Re-check after every change that touches the corridor or parking zone.
Pass-door requirements and project documentation can be discussed with EBUNGE. Review the movable wall product information and the planning resources before the coordination meeting, then bring the drawings to the discussion.
FAQ: Stacking Pocket Corridor Recess Clear Width Check
When should the clear width check begin?
As soon as a stacking position and a corridor recess appear on the same plan. Early review is cheaper than resolving a conflict after services are coordinated.
Does a floor track affect the check?
EBUNGE panels are top-hung and cross the opening without a floor track along the partition line. The check therefore focuses on the overhead route, the parking envelope and fixed obstructions.
Can the parking position be customized?
Parking style is customized to the customer layout and project requirements. The proposed arrangement must still be reviewed against the coordinated drawings and support conditions.
Which finishes can be considered?
Confirmed options include laminate, melamine, fabric, leather, glass and other approved surfaces. Confirm suitability for the project’s cleaning and appearance requirements.
Can acoustic performance be confirmed from the recess drawing?
No. Acoustic requirements need project-specific documentation.
What should be brought to a supplier discussion?
Layout drawings, the proposed route, parking position, pass-door needs and any acoustic or dimensional requirements the project has set.
Conclusion and Next Step
The stacking pocket corridor recess clear width check is a discipline of overlaying drawings and confirming evidence. Keep the route continuous, reserve the parking envelope, measure the agreed clear width line and record every project-specific requirement. Confirm support, acoustic and dimensional requirements with the responsible designers and supplier before procurement.
To discuss your layout, pass-door requirements and project documentation, contact EBUNGE with the coordinated drawings.


