What a Handover File Must Show When Track Fixings Were Set to a Site
Quick answer: handover file
A track fixing site datum handover file is the record that lets the next team understand how the overhead track was positioned relative to a reference the site actually used. It is not a marketing document and it is not a substitute for project drawings. Its job is traceability: which datum, which revision, which fixing locations, and which items still need confirmation before the space is accepted.
This guide is written for overseas contractors, architects, interior designers, owners and renovation teams who receive or compile that file. Every recommendation below stays inside what can be verified from drawings, site records and maintained product information. The suitability of each route and parking arrangement depends on the approved layout, circulation, ceiling interfaces and operating sequence.
Why a Site Datum Changes the Handover Conversation
A site datum is a reference point or level that the construction team adopts for setting out work. When track fixings are positioned from that datum rather than from a single room dimension, the handover file must connect two worlds: the setting-out logic used on site and the coordinated layout used to plan the partition.
EBUNGE movable partition panels are individually movable and suspended from a top track. They cross the opening without a floor track and park at a planned stacking position. That operating concept makes the overhead route central to the design, so the handover file should show how the installed track relates to the reviewed layout rather than describing the panels in isolation.
Straight, turning and stacking routes are reviewed from the layout. If the datum influenced where the track begins, ends or turns, the file should say so in a way a future reviewer can follow without guessing.
Core Records the File Should Contain
Think of the handover file as a chain of evidence. Each record should identify its source, its revision and the person or party responsible for it. A document without a revision reference is difficult to defend later.
Datum and setting-out record
State the datum used, where it is physically marked or referenced, and how track fixing positions were derived from it. Include the setting-out drawing or survey note that carries the same reference. If the datum was transferred between floors or zones, record that transfer method as described by the site team.
Coordinated layout and route drawings
Attach the reviewed layout showing the opening, the track line, any turning section and the planned stacking position. The drawing should be the revision that the installation team worked to, not an earlier concept sketch. Where the as-built condition differs, mark the difference rather than replacing the original.
Fixing and support documentation
The file should identify the supporting structure assumed by the design and the party who confirmed it. The exact route, junction arrangement, continuous overhead path and parking position must be confirmed from the coordinated project drawings.
A Handover Checklist for Track Fixing Records
Use the following checklist as a review aid. It is a documentation structure, not a statement that any particular project will include every item in the same form.
- Datum reference identified, with its location and the date it was established.
- Setting-out drawing linked to the datum and to the reviewed partition layout.
- Track route drawing showing straight runs, turns and the planned stacking position.
- Fixing locations recorded against the drawing revision used on site.
- Supporting structure assumptions stated, with the confirming party named.
- Finish selections recorded against the approved finish options for the project.
- Pass-door requirements noted where the layout includes them.
- Open items, deviations and pending confirmations listed with owners.
Confirmed finish options for EBUNGE movable partitions include laminate, melamine, fabric, leather, glass and other approved surfaces.
How to Link Drawings, Site Evidence and Product Information
A drawing shows intent. A site record shows what was observed. Product information describes the maintained system concept. Visible references can support layout discussion but do not verify hidden construction or performance.
Evidence note: a handover file can show that a track was set from a stated datum and that a route was reviewed. It cannot, by itself, establish acoustic performance, structural adequacy or fitness for a particular opening unless the matching project evidence is included.
Where acoustic separation matters, the project team should confirm the required criteria and the supporting documentation separately.
For product context, refer to the movable partition wall page and the resources library. Use them to frame questions for the project team, not to replace project-specific drawings.
Common Gaps That Weaken a Datum-Based Handover
Most disputes are not about the datum itself but about missing links around it. A file may name a datum yet fail to show which drawing revision used it. Or it may show a track line without recording the stacking position that the layout assumed.
Revision mismatch
If the setting-out drawing and the partition layout carry different revisions, the file should explain the relationship. Do not silently merge them. A short revision log is more useful than a tidy but ambiguous folder.
Route assumptions left implicit
Because panels travel along an overhead route, every proposed movement path needs a continuous connected overhead route and project-specific support review. Record the reviewed route and any constraint noted by the design team.
Unverified performance language
Replace them with the exact confirmation boundary: who will confirm, against which drawing or criterion, and by when.
Open Items, Sign-Off and the Contact Route
A credible handover file ends with a clear list of what remains open. Each item should have an owner, a reference document and a status. Sign-off should distinguish between records received, records reviewed and records accepted.
Pass-door requirements and project documentation can be discussed with the EBUNGE team as part of project coordination. Bring the reviewed layout, the datum reference and the current drawing revision so the conversation stays grounded in your project rather than in general assumptions.
Before acceptance, confirm project-specific support, acoustic and dimensional requirements with the responsible parties. The handover file is stronger when it shows those confirmations explicitly instead of leaving readers to infer them.
Frequently Asked Questions
What is a track fixing site datum handover file?
It is a project record that links the datum used on site to the track fixing positions and the reviewed partition layout. It should include drawing revisions, setting-out references and a list of open items.
Does the file need to show acoustic test results?
Only if the project specification requires them and the matching evidence exists. This article does not assign acoustic values. Acoustic criteria and supporting documentation should be confirmed for the specific project.
Can the handover file confirm structural adequacy of the track support?
No. The file can record the assumed supporting structure and who confirmed it, but it should not present a drawing note as proof of capacity.
How should the stacking position be documented?
Show the planned stacking position on the reviewed layout and note any constraint identified during coordination. Parking style is customized to the customer layout and project requirements, so the file should reflect the coordinated design.
What if the as-built track differs from the drawing?
Record the difference, keep the original revision visible and add the as-built note with its source. Do not overwrite the reviewed drawing; traceability depends on showing both.
Which finish information belongs in the file?
Record the approved finish selection for the project from the confirmed options, such as laminate, melamine, fabric, leather, glass or other approved surfaces. A finish record does not demonstrate performance.
Conclusion
A track fixing site datum handover file earns trust by being specific and honest about its limits. Name the datum, link it to the reviewed layout, record the route and stacking position, and list every open confirmation with an owner. Keep performance claims out unless the matching project evidence is attached.
If you are preparing documentation for an upcoming flexible-space project, contact EBUNGE to discuss pass-door requirements, finish selections and the project drawings that should accompany your handover file.


