Home » Movable Wall » Hotel partition walls
Ballroom Acoustic Wooden Door Hotel Folding Partition Walls
Hotel partition walls can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.
Highlights:
- Factory Direct Price
- Free Installation Guide for Hotel Partition Walls
- Free AutoCAD Design
- Quick Production Time Within 7 days
- 3 Years Warranty
- Reply In 8 Hours
Specifications
Details | Specifications |
---|---|
Model | BG65 Hotel Partition Walls |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Ballroom Acoustic Wooden Door Hotel Folding Partition Walls
Hotel partition walls can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
Hotel partition wall is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the hotel partition walls panel, there is sound insulation rubber, it can help to insulate the sound entering. The hotel partition wall is hanging on the aluminum track, assembled with muti direction wheels.


Advantages
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for hotel partition walls.
FAQ
1. How to select the suitable hotel partition walls for your site?
We have 4 types of hotel partition walls, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right hotel partition walls upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for hotel partition walls difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the hotel partition walls?
Sea transportation.If it is urgent, it can be by air.
5. How do the hotel partition walls packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The hotel partition wall panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Related Products

Movable wall system
Floor to ceiling sound proof folding movable partition walls system

Folding partition walls
Banquet hall acoustic movable wooden soundproof sliding folding partition wall

Demountable partition walls
Customized Laminate Folding Wooden Demountable Partition Wall for Office