Get Movable Partition Walls to Make Space Management Easier, Make Your Business Easier.
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Hotel sliding foloding partitions can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.
Details | Specifications |
---|---|
Model | BG65 Series movable wall system |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Hotel sliding folding partitions can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
Conference room soundproof wall partition is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the sliding folding partition panel, there is sound insulation rubber, it can help to insulate the sound entering.
The hotel sliding folding partition is hanging on the aluminum track, assembled with muti direction wheels.
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for sliding folding partition panels.
1. How to select the suitable sliding folding partition system for your site?
We have 4 types of sliding folding partitions, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right sliding folding partitions upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for sliding folding partitions difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the sliding folding partitions?
Sea transportation.If it is urgent, it can be by air.
5. How do the sliding folding partitions packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The movable wall panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Classroom Sliding Conference Room Partition Moveable Door for Office
Wood Soundproofing Sliding Office Wall Moving Room Partition For Dance Hall
Demountable Acoustic Movable Sliding Partition Wall Philippines
School classroom soundproof movable parititon sliding folding door
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.