Sliding Folding Movable Partition Wall For Banquet Hall

Soundproof folding doors accordion room divider acoustic panel mdf movable partition walls.

Highlights:

  • Factory directly price
  • Hotel banquet hall movable partition wall
  • Folding and sliding, soundproof panels
  • Support customized size & surface
  • Free AutoCAD design
  • No MOQ, small order welcome
  • Quick shipping within 5 days

Specifications

DetailsSpecifications​
ModelBG100 Series movable partition wall​
Dimensions Panel thickness 100mm Panel height up to 13000mm Panel width 600-1230mm
Material Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)
Color White, black, brown, grey, beige, customized.
Weight Approx 30-45 kg/m²
Warranty 3 years

Features

Nowadays, BG100 movable walls can divide the space speedily and conveniently. They are specified where functional space delineation is an integral element within the partition project. Due to their flexibility and cost-effectiveness, the sliding partitions allow large rooms to be conveniently sub-divided to maximize space utilization. Principle applications include offices, meeting rooms, leisure facilities, schools, hotel banquet hall, churches, conference and function halls, exhibition centers, banks, restaurants and so on.

FAQ

1. How to select the suitable BG100 movable walls for your site?

 

We have 4 types of sliding door system, type 65, type 85, type 100 and 125 ultra-high system.

 

You can choose the right BG100 movable walls upon the height and soundproof requirement as following:

 

Type 65 – Max height: 4000 mm.

Type 85 – Max height: 6000 mm.

Type 100 – Max height: 8000 mm.

Type 125 – Max height: 17000 mm.

 

2. Is the installation for BG100 movable walls system difficult?

 

No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.

 

3. What is lead time?

 

The production time is 7 – 20 days based on the different quantity. 

 

And the delivery time is around 7 – 40 days based on the different country.

 

4. How to transport the BG100 movable walls?

 

Sea transportation.If it is urgent, it can be by air.

 

5. How do the BG100 movable walls packing?

 

Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.

 

The BG100 movable wall panel and track,fittings will be packed separately.

 

6. Are you a trading company or manufacturer?

 

We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.

Related Products

en_USEnglish

Request a Free Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!