Get Movable Partition Walls to Make Space Management Easier, Make Your Business Easier.
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Hanging church classroom foldable movable partition wall wood melamine room divider.
Details | Specifications |
---|---|
Model | BG85 Series movable partition wall |
Dimensions | Panel thickness 85mm Panel height up to 6000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 25-30 kg/m² |
Warranty | 3 years |
Thanks for the trust from the client. Ebunge partition clients cooperated with us for the china movable partition for meeting room orders. Customize size, surface and colors, they will use them in the school, church, classroom, office, meeting room, conference room and so on.
Everything goes well and our client felt satisfied with our china movable partition for meeting room and happy to cooperate with BUNGE Company.
1. How to select the suitable BG85 movable walls for your site?
We have 4 types of movable wall system, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right BG85 movable walls upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for BG85 movable walls difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the BG85 movable walls?
Sea transportation.If it is urgent, it can be by air.
5. How do the BG85 movable walls packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The BG85 movable wall panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Training Room Soundproof Folding Moveable Sliding Partition Door System
Floor to ceiling mounted wooden office acoustic meeting room dividers
United States Conference Hall Movable Wall Folding Sound Proof Partition Price
Banquet hall acoustic movable wooden soundproof sliding folding partition wall
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Send us a message if you have any questions or request a quote. We will be back to you ASAP!