Fabric Surface Mobile Foldable Partition Walls

Fabric mobile partition walls can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.

Highlights:

  • Factory Direct Price
  • Free Installation Guide for Fabric Mobile Partition Walls
  • Free AutoCAD Design
  • Quick Production Time Within 7 days
  • 3 Years Warranty
  • Reply In 8 Hours

Specifications

DetailsSpecifications​
ModelBG65 Fabric Mobile Partition Walls
Dimensions Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm
Material Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)
Color White, black, brown, grey, beige, customized.
Weight Approx 22-35 kg/m²
Warranty 3 years

Features

Fabric mobile partition walls can separate the space speedily and conveniently. There is top hung system without the need for a floor track.

 

Fabric mobile partition wall is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.

 

Around the fabric mobile partition wall panel, there is sound insulation rubber, it can help to insulate the sound entering.

 

The mobile partition wall system is hanging on the aluminum track, assembled with muti direction wheels.

Advantages

1. Top hanging system, no floor tracks.

 

2. Everything can be customized, including the size, colors and surfaces.

 

3. The operation is very easy, 1 person can finish the whole operation.

 

4. More than 60 colors to choose.

 

5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.

 

6. Sound insulated aluminum frame structure, enhance the acoustic effect.

 

7. Single or double pass through door available.

 

8. Various stacking options for fabric mobile partition wall system.

FAQ

1. How to select the suitable fabric mobile partition wall system for your site?

 

We have 4 types of fabric mobile partition wall system, type 65, type 85, type 100 and 125 ultra-high system.

 

You can choose the right mobile partition wall system upon the height and soundproof requirement as following:

 

Type 65 – Max height: 4000 mm.

Type 85 – Max height: 6000 mm.

Type 100 – Max height: 8000 mm.

Type 125 – Max height: 17000 mm.

 

2. Is the installation for fabric mobile partition wall system difficult?

 

No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.

 

3. What is lead time?

 

The production time is 7 – 20 days based on the different quantity. 

 

And the delivery time is around 7 – 40 days based on the different country.

 

4. How to transport the fabric mobile partition wall?

 

Sea transportation.If it is urgent, it can be by air.

 

5. How do the fabric mobile partition wall system packing?

 

Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.

 

The mobile partition wall panel and track,fittings will be packed separately.

 

6. Are you a trading company or manufacturer?

 

We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.

Related Products

Movable wall cost

Movable wall cost

Convention Hall Foldable Partitions Acoustic Movable Walls Cost in Thailand

en_USEnglish

Request a Free Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!