Get Movable Partition Walls to Make Space Management Easier, Make Your Business Easier.
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Soundproof office partition can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.
Details | Specifications |
---|---|
Model | BG65 Soundproof Office Partition Supplier |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Soundproof office partition supplier can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
Soundproof office partition is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the soundproof office partition system, there is sound insulation rubber, it can help to insulate the sound entering.
The soundproof office partition system is hanging on the aluminum track, assembled with muti direction wheels.
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for soundproof office partition.
1. How to select the suitable soundproof office partition supplier?
We have 4 types of soundproof office partitions, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right soundproof office partitions upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for soundproof office partitions difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the soundproof office partition system?
Sea transportation.If it is urgent, it can be by air.
5. How do the soundproof office partition packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The soundproof office partition system panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.acoust
Soundproof Wooden Conference room Sliding Movable Partition Wall Detail
Flexible soundproof acoustic church movable partition wall for office meeting room
Commercial Foldable Sliding Folding Partition Wall Price For Banquet Hall
Commercial Sliding Folding Partition Walls For Restaurant
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Send us a message if you have any questions or request a quote. We will be back to you ASAP!