Get Movable Partition Walls to Make Space Management Easier, Make Your Business Easier.
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Sliding partition wall philippines can be applied in hotel, banquet hall, multi-function room, training room, office, convention hall etc. EBUNGE Family always provide nice quality and reliable services at very competitive prices.
Details | Specifications |
---|---|
Model | BG65 Sliding Partition Wall Philippines |
Dimensions | Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm |
Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Color | White, black, brown, grey, beige, customized. |
Weight | Approx 22-35 kg/m² |
Warranty | 3 years |
Sliding partition wall philippines can separate the space speedily and conveniently. There is top hung system without the need for a floor track.
It is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.
Around the sliding partition wall panel, there is sound insulation rubber, it can help to insulate the sound entering.
The partition wall is hanging on the aluminum track, assembled with muti direction wheels.
1. Top hanging system, no floor tracks.
2. Everything can be customized, including the size, colors and surfaces.
3. The operation is very easy, 1 person can finish the whole operation.
4. More than 60 colors to choose.
5. Extensive range of surface also available, such as mdf, melamine, fabric, leather, HPL etc.
6. Sound insulated aluminum frame structure, enhance the acoustic effect.
7. Single or double pass through door available.
8. Various stacking options for sliding partition wall philippines.
1. How to select the suitable sliding partition walls philippines for your site?
We have 4 types of sliding partition walls philippines, type 65, type 85, type 100 and 125 ultra-high system.
You can choose the right sliding partition walls philippines upon the height and soundproof requirement as following:
Type 65 – Max height: 4000 mm.
Type 85 – Max height: 6000 mm.
Type 100 – Max height: 8000 mm.
Type 125 – Max height: 17000 mm.
2. Is the installation for sliding partition walls philippines difficult?
No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.
3. What is lead time?
The production time is 7 – 20 days based on the different quantity.
And the delivery time is around 7 – 40 days based on the different country.
4. How to transport the sliding partition walls?
Sea transportation.If it is urgent, it can be by air.
5. How do the sliding partition walls packing?
Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.
The movable restaurant partitions panel and track,fittings will be packed separately.
6. Are you a trading company or manufacturer?
We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.
Airport Waiting Metal Seaters Used Hospital Waiting Room Chairs
Acoustic Sliding Soundproof Operable Partition Banquet Hall Room Dividers
Office Space Divider Moveable Acoustic Partition Wall Supplier
Aluminum acoustic hotel soundproof folding sliding movable partition wall
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.