Get Movable Partition Walls to Make Space Management Easier, Make Your Business Easier.
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Office sound proof interior aluminum portable folding sliding tempered glass partition doors
Details | Specifications |
---|---|
Model | BG85 movable glass partition wall |
Dimensions | Panel thickness 85mm Panel height up to 5000mm Panel width 600-1230mm |
Material | 10/12mm tempered glass |
Color | silver, black, white |
Weight | Approx 25-30 kg/m² |
Warranty | 3 years |
1. Office soundproof partitions can separate the space speedily and conveniently.
2. Muti-function: sound insulation,heat insulation,fireproof function.
3.Top hung system without the need for a floor track.
4.The office soundproof partitions are made from high-density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.
5.Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.
United State Acoustic Sliding Door Operable Partition Foldable Wall
Floor to ceiling sound proof folding movable partition walls system
Demountable Acoustic Movable Sliding Partition Wall Philippines
Collapsible operable door movable partition wall for conference room
Ebunge provides movable partition walls for many applications, meeting the customer’s demand for a quality-oriented and cost-effective business.
Send us a message if you have any questions or request a quote. We will be back to you ASAP!