Home » Glass Partition » BG85 office glass partition wall
Commercial interior aluminum tempered movable office glass partition walls
Office sound proof interior aluminum portable folding sliding tempered glass partition doors
Highlights:
- Factory directly price
- sound insulation,heat insulation,fireproof function
- Sliding hanging ceiling track system
- Free AutoCAD design
- Free samples
- No MOQ, small order welcome
- Wooden box for panels packing
Specifications
Details | Specifications |
---|---|
Model | BG85 movable glass partition wall |
Dimensions | Panel thickness 85mm Panel height up to 5000mm Panel width 600-1230mm |
Material | 10/12mm tempered glass |
Color | silver, black, white |
Weight | Approx 25-30 kg/m² |
Warranty | 3 years |
Modern design modular movable office glass partition wall
1.Office soundproof partitions can separate the space speedily and conveniently.
2.Muti-function: sound insulation,heat insulation,fireproof function.
3.Top hung system without the need for a floor track.
4.The office soundproof partitions are made from high-density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.
5.Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.

Related Products

BG100 movable wall
Sliding folding wooden room movable partition wall for banquet hall

BG36 office glass partition wall
Operable frameless office partition walls 12mm glass folding door glass partitions

BG65 movable wall
Aluminum acoustic hotel soundproof folding sliding movable partition wall