Home » Glass Partition » BG65 office glass partition wall
Previous
Next
Office aluminum frame sliding folding movable glass partition walls
Demountable full height movable office tempered glass partition wall with aluminium frame
Highlights:
- Factory directly price
- Movable office glass partition wall
- Aluminum frame with tempered glass
- Hanging ceiling track system
- Foldable and movable glass panels
- Free AutoCAD design
- No MOQ, small order welcome
Specifications
Details | Specifications |
---|---|
Model | BG65 movable glass partition wall |
Dimensions | Panel thickness 65mm Panel height up to 3000mm Panel width 600-1230mm |
Material | 9/10mm tempered glass |
Color | silver, black, white |
Weight | Approx 20-25 kg/m² |
Warranty | 3 years |
Sliding aluminium frame office movable glass partition wall
Sliding glass panels are suspended from an overhead track and carrier system. There is no floor tracks or guides are needed. However, the panels require floor pins and receptacles in the floor to keep them secure in the opening.
Sliding glass walls are made from a sheet of glass attached to top and bottom aluminum horizontal rails. The panels are shipped fully assembled.

Related Products

BG65 office glass partition wall
Office aluminum frame sliding folding movable glass partition walls

BG80 office glass partition wall
Demountable Slid Office Tempered Glass Partition Wall with Aluminium Frame

BG85 office glass partition wall
Commercial interior aluminum tempered movable office glass partition walls