Office Sliding Folding Movable Glass Partition Walls

Demountable full height movable office tempered glass partition wall with aluminium frame

Highlights:

  • Factory directly price
  • Movable office glass partition wall
  • Aluminum frame with tempered glass
  • Hanging ceiling track system
  • Foldable and movable glass panels
  • Free AutoCAD design
  • No MOQ, small order welcome

Specifications

DetailsSpecifications​
ModelBG65 movable glass partition wall
Dimensions Panel thickness 65mm Panel height up to 3000mm Panel width 600-1230mm
Material 9/10mm tempered glass
Color silver, black, white
Weight Approx 20-25 kg/m²
Warranty 3 years

Features

Sliding glass panels are suspended from an overhead track and carrier system. There is no floor tracks or guides are needed. However, the panels require floor pins and receptacles in the floor to keep them secure in the opening.
Sliding glass walls are made from a sheet of glass attached to top and bottom aluminum horizontal rails. The panels are shipped fully assembled.

Related Products

en_USEnglish

Get In Touch