Acoustic Hotel Folding Sliding Movable Partition Wall

Folding door aluminum partition in Saudia Arabia soundproof folding moving partition wall

Highlights:

  • Factory directly price
  • Aluminum acoustic movable partition wall
  • Folding and sliding, no floor track
  • Soundproof and foldable panels
  • Support customized size & surface
  • Free AutoCAD design
  • Quick shipping within 5 days

Specifications

DetailsSpecifications​
ModelBG65 Series movable partition wall​
Dimensions Panel thickness 65mm Panel height up to 4000mm Panel width 600-1230mm
Material Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)
Color White, black, brown, grey, beige, customized.
Weight Approx 22-35 kg/m²
Warranty 3 years

Features

Folding movable partition wall can separate the space speedily and conveniently. There is top hung system without the need for a floor track.

 

Conference room soundproof wall partition is made from high-density aluminum frame, specially made rubber, excellent sound insulation cotton and finish surface, etc.

 

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.

 

The soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.

FAQ

1. How to select the suitable BG65 movable wall for your site?

 

We have 4 types of BG65 movable wall system, type 65, type 85, type 100 and 125 ultra-high system.

 

You can choose the right BG65 movable wall upon the height and soundproof requirement as following:

 

Type 65 – Max height: 4000 mm.

Type 85 – Max height: 6000 mm.

Type 100 – Max height: 8000 mm.

Type 125 – Max height: 17000 mm.

 

2. Is the installation for BG65 movable wall system difficult?

 

No, it is very easy. We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer to supervising the installation as request.

 

3. What is lead time?

 

The production time is 7 – 20 days based on the different quantity. 

 

And the delivery time is around 7 – 40 days based on the different country.

 

4. How to transport the BG65 movable wall?

 

Sea transportation.If it is urgent, it can be by air.

 

5. How do the BG65 movable wall packing?

 

Carton paper packaging,MDF batten cover all around corner. And outside with wooden box.

 

The BG65 movable wall panel and track,fittings will be packed separately.

 

6. Are you a trading company or manufacturer?

 

We are 100% real manufacturer, we have our own factory and showroom in Guangzhou, China. Very welcome to visit us.

Related Products

en_USEnglish

Request a Free Quote

Send us a message if you have any questions or request a quote. We will be back to you ASAP!